Plat (4) 5-8-011 — Wainiha
56 parcels in plat 4-5-8-011, Wainiha (Kauaʻi), 22.4 acres in all, the largest 3.65 acres. Land use: Urban 55, Conservation 1. Zoning: R-4 (43), O (7), R-2 (3), RR (2).
56 in a FEMA high-risk flood zone; 56 in the Special Management Area; 56 in a tsunami evacuation zone; 38 with a cesspool.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (4) 5-8-011:001 | 0.282 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:002 | 0.279 | Urban | R-4 | VE | SMA, flood VE, tsunami, 2 cesspools |
| (4) 5-8-011:003 | 0.168 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:004 | 0.167 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:005 | 0.167 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:006 | 0.209 | Conservation | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:007 | 0.507 | Urban | R-4 | VE | SMA, flood VE, tsunami, 3 cesspools |
| (4) 5-8-011:008 | 0.716 | Urban | R-2 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:009 | 0.154 | Urban | O | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:010 | 0.305 | Urban | R-4 | VE | SMA, flood VE, tsunami, SLR 3.2 ft, 1 cesspool |
| (4) 5-8-011:011 | 0.447 | Urban | R-4 | VE | SMA, flood VE, tsunami, SLR 3.2 ft, 1 cesspool |
| (4) 5-8-011:012 | 0.199 | Urban | R-4 | VE | SMA, flood VE, tsunami, SLR 3.2 ft, 2 cesspools |
| (4) 5-8-011:013 | 1.73 | Urban | RR | VE | SMA, flood VE, tsunami, SLR 3.2 ft, 2 cesspools |
| (4) 5-8-011:015 | 0.515 | Urban | R-4 | VE | SMA, flood VE, tsunami, 2 cesspools |
| (4) 5-8-011:016 | 0.268 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:018 | 1.02 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:019 | 1.02 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:020 | 0.257 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:021 | 0.289 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:022 | 0.592 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:023 | 0.137 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:024 | 0.126 | Urban | O | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:025 | 0.140 | Urban | O | VE | SMA, flood VE, tsunami, SLR 3.2 ft, 1 cesspool |
| (4) 5-8-011:026 | 0.126 | Urban | O | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:027 | 3.65 | Urban | RR | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (4) 5-8-011:028 | 0.132 | Urban | O | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:029 | 0.147 | Urban | O | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:030 | 0.147 | Urban | O | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:031 | 0.302 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:032 | 0.268 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:033 | 0.278 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:034 | 0.271 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:037 | 0.257 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:038 | 0.134 | Urban | R-4 | VE | SMA, flood VE, tsunami, 2 cesspools |
| (4) 5-8-011:039 | 0.137 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:040 | 0.150 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:041 | 0.181 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:042 | 0.155 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:043 | 0.137 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:044 | 0.135 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:045 | 0.145 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:046 | 0.140 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:047 | 0.140 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:048 | 0.157 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:049 | 0.534 | Urban | R-4 | VE | SMA, flood VE, tsunami, SLR 3.2 ft, 1 cesspool |
| (4) 5-8-011:050 | 0.210 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:051 | 0.245 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:052 | 0.267 | Urban | R-4 | VE | SMA, flood VE, tsunami, 2 cesspools |
| (4) 5-8-011:053 | 0.230 | Urban | R-4 | VE | SMA, flood VE, tsunami, 2 cesspools |
| (4) 5-8-011:054 | 0.196 | Urban | R-4 | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (4) 5-8-011:055 | 0.346 | Urban | R-4 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:056 | 0.160 | Urban | R-4 | VE | SMA, flood VE, tsunami, 1 cesspool |
| (4) 5-8-011:057 | 0.250 | Urban | R-2 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:058 | 0.780 | Urban | R-2 | VE | SMA, flood VE, tsunami |
| (4) 5-8-011:059 | 0.299 | Urban | R-4 | VE | SMA, flood VE, tsunami, SLR 3.2 ft, 2 cesspools |
| (4) 5-8-011:999 | 2.03 | Urban | — | VE | SMA, flood VE, tsunami |
One parcel of plat 4-5-8-011?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file