Plat (2) 5-8-005 — Honoulimaloʻo
13 parcels in plat 2-5-8-005, Honoulimaloʻo (Molokaʻi), 11.5 acres in all, the largest 8.02 acres. Land use: Conservation 10, Agricultural 3. Zoning: INT Interim (11), AG Agriculture (2).
10 in a FEMA high-risk flood zone; 11 in the Special Management Area; 11 in a tsunami evacuation zone; 1 with a cesspool.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (2) 5-8-005:001 | 0.256 | Conservation | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 5-8-005:002 | 0.088 | Conservation | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 5-8-005:003 | 0.046 | Conservation | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 5-8-005:004 | 0.208 | Conservation | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 5-8-005:005 | 0.199 | Conservation | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 5-8-005:006 | 0.247 | Conservation | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 5-8-005:007 | 0.219 | Conservation | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 5-8-005:008 | 0.424 | Agricultural | INT Interim | X | tsunami |
| (2) 5-8-005:009 | 0.377 | Conservation | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 5-8-005:010 | 0.746 | Conservation | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 5-8-005:011 | 8.02 | Agricultural | AG Agriculture | X | SMA |
| (2) 5-8-005:012 | 0.379 | Conservation | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 5-8-005:013 | 0.245 | Agricultural | AG Agriculture | X |
One parcel of plat 2-5-8-005?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file