Plat (2) 5-6-003 — ‘Ualapu‘e / Kahananui
39 parcels in plat 2-5-6-003, ‘Ualapu‘e / Kahananui (Molokaʻi), 20.0 acres in all, the largest 3.18 acres. Land use: Urban 38, — 1. Zoning: INT Interim (39).
26 in a FEMA high-risk flood zone; 38 in the Special Management Area; 38 in a tsunami evacuation zone; 15 with a cesspool.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (2) 5-6-003:001 | 0.477 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 5-6-003:002 | 0.279 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 5-6-003:003 | 0.147 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool |
| (2) 5-6-003:004 | 0.090 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 5-6-003:005 | 0.552 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 5-6-003:006 | 0.382 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool |
| (2) 5-6-003:007 | 1.04 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-6-003:008 | 1.02 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 5-6-003:009 | 0.346 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 5-6-003:010 | 0.437 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 5-6-003:012 | 0.314 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-6-003:013 | 1.32 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-6-003:014 | 0.012 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 5-6-003:016 | 0.482 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-6-003:017 | 0.675 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-6-003:019 | 0.989 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:020 | 0.377 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:021 | 0.951 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 5-6-003:022 | 0.262 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-6-003:023 | 0.685 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:024 | 0.287 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:025 | 0.142 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:026 | 0.337 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:027 | 0.383 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:028 | 0.085 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:029 | 0.101 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 5-6-003:030 | 0.299 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 5-6-003:031 | 0.174 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 5-6-003:032 | 0.058 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 5-6-003:033 | 0.659 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 5-6-003:034 | 0.860 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 5-6-003:035 | 3.18 | — | INT Interim | VE | flood VE, DHHL |
| (2) 5-6-003:037 | 1.17 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool |
| (2) 5-6-003:038 | 0.295 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 5-6-003:039 | 0.253 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 5-6-003:040 | 0.197 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-6-003:041 | 0.203 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-6-003:042 | 0.478 | Urban | INT Interim | X | SMA, tsunami |
| (2) 5-6-003:043 | 0.008 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
One parcel of plat 2-5-6-003?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file