Plat (2) 5-4-017 — Kawela
55 parcels in plat 2-5-4-017, Kawela (Molokaʻi), 65.0 acres in all, the largest 46.28 acres. Land use: Urban 49, Agricultural 4, — 1, Conservation 1. Zoning: INT Interim (55).
52 in a FEMA high-risk flood zone; 54 in the Special Management Area; 53 in a tsunami evacuation zone; 17 with a cesspool.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (2) 5-4-017:001 | 0.231 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:002 | 0.296 | Urban | INT Interim | X | SMA, tsunami, fire high |
| (2) 5-4-017:003 | 0.484 | Urban | INT Interim | X | SMA, tsunami, fire high |
| (2) 5-4-017:004 | 0.551 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:005 | 0.575 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:006 | 0.288 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-017:007 | 0.454 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:008 | 0.289 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, fire high |
| (2) 5-4-017:009 | 0.276 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:010 | 0.499 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:011 | 0.516 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-017:012 | 0.547 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:013 | 0.270 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:014 | 0.618 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:015 | 0.374 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:016 | 0.781 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:017 | 0.380 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-017:018 | 0.338 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:019 | 0.685 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:020 | 1.11 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:021 | 0.534 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 2 cesspools, fire high |
| (2) 5-4-017:022 | 0.472 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:023 | 0.358 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:024 | 0.309 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:025 | 0.256 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, fire high |
| (2) 5-4-017:026 | 0.223 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-017:027 | 0.195 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-017:028 | 0.155 | Agricultural | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, fire high |
| (2) 5-4-017:029 | 0.238 | Agricultural | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:030 | 0.385 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:031 | 0.167 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:032 | 0.170 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-017:033 | 0.196 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-017:034 | 0.225 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:035 | 0.222 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, fire high |
| (2) 5-4-017:036 | 0.245 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, fire high |
| (2) 5-4-017:037 | 0.280 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:038 | 0.363 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-017:039 | 0.358 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:040 | 0.591 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 2 cesspools, fire high |
| (2) 5-4-017:041 | 0.311 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:042 | 0.190 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:043 | 0.362 | — | INT Interim | AE | SMA, flood AE, SLR 3.2 ft |
| (2) 5-4-017:044 | 0.122 | Agricultural | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:045 | 0.392 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:046 | 0.116 | Agricultural | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (2) 5-4-017:047 | 0.200 | Urban | INT Interim | X | SMA, tsunami, fire high |
| (2) 5-4-017:048 | 0.183 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:049 | 46.28 | Conservation | INT Interim | VE | flood VE |
| (2) 5-4-017:051 | 0.284 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:052 | 0.232 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, fire high |
| (2) 5-4-017:053 | 0.230 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:054 | 0.311 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:055 | 0.145 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-017:056 | 0.164 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
One parcel of plat 2-5-4-017?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file