Plat (2) 5-4-006 — Kamiloloa / Makakupa‘ia
57 parcels in plat 2-5-4-006, Kamiloloa / Makakupa‘ia (Molokaʻi), 59.5 acres in all, the largest 25.86 acres. Land use: Urban 55, Conservation 1, Agricultural 1. Zoning: INT Interim (56), Road (1).
49 in a FEMA high-risk flood zone; 56 in the Special Management Area; 56 in a tsunami evacuation zone; 39 with a cesspool.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (2) 5-4-006:001 | 0.984 | Urban | INT Interim | AE | SMA, flood AE, tsunami, DHHL, fire high |
| (2) 5-4-006:002 | 0.988 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:003 | 0.982 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:004 | 0.977 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:005 | 0.934 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:006 | 0.974 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 2 cesspools, DHHL, fire high |
| (2) 5-4-006:007 | 0.952 | Urban | INT Interim | A | SMA, flood A, tsunami, DHHL, fire high |
| (2) 5-4-006:008 | 0.996 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 2 cesspools, DHHL, fire high |
| (2) 5-4-006:009 | 0.924 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 2 cesspools, DHHL, fire high |
| (2) 5-4-006:010 | 0.962 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:011 | 0.942 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:012 | 0.946 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:013 | 0.480 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:014 | 0.969 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:015 | 0.963 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:016 | 0.963 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:017 | 0.988 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:018 | 0.994 | Urban | INT Interim | X | SMA, tsunami, DHHL |
| (2) 5-4-006:019 | 1.46 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 2 cesspools, DHHL |
| (2) 5-4-006:020 | 0.320 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:021 | 0.298 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:022 | 0.286 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, DHHL |
| (2) 5-4-006:023 | 0.956 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:024 | 0.978 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:025 | 25.86 | Conservation | INT Interim | VE | flood VE, DHHL |
| (2) 5-4-006:026 | 1.66 | Urban | INT Interim | AE | SMA, flood AE, tsunami, DHHL, fire high |
| (2) 5-4-006:028 | 0.250 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-006:029 | 0.707 | Urban | INT Interim | AE | SMA, flood AE, tsunami, DHHL, fire high |
| (2) 5-4-006:030 | 0.724 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft, DHHL, fire high |
| (2) 5-4-006:031 | 0.065 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 5-4-006:032 | 0.932 | Agricultural | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 5-4-006:033 | 0.501 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 2 cesspools, fire high |
| (2) 5-4-006:034 | 0.261 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-006:035 | 0.248 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-006:036 | 0.193 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-006:037 | 0.645 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-006:038 | 0.028 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-006:040 | 0.088 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 5-4-006:041 | 0.369 | Urban | Road | X | SMA, tsunami, fire high |
| (2) 5-4-006:053 | 0.252 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-006:055 | 0.316 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:056 | 0.371 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:057 | 0.441 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL, fire high |
| (2) 5-4-006:058 | 0.239 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 2 cesspools, fire high |
| (2) 5-4-006:059 | 0.250 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-006:060 | 0.153 | Urban | INT Interim | AE | SMA, flood AE, tsunami, fire high |
| (2) 5-4-006:061 | 0.161 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, 1 cesspool, fire high |
| (2) 5-4-006:062 | 0.225 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, fire high |
| (2) 5-4-006:063 | 0.499 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-4-006:064 | 0.531 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-4-006:065 | 0.531 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 5-4-006:066 | 0.483 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 5-4-006:067 | 0.334 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:068 | 0.307 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool, DHHL |
| (2) 5-4-006:069 | 0.210 | Urban | INT Interim | AE | SMA, flood AE, tsunami, DHHL |
| (2) 5-4-006:070 | 0.230 | Urban | INT Interim | AE | SMA, flood AE, tsunami, DHHL |
| (2) 5-4-006:071 | 0.227 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft, DHHL |
One parcel of plat 2-5-4-006?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file