Plat (2) 3-2-015 — Waiehu
87 parcels in plat 2-3-2-015, Waiehu (Maui), 18.0 acres in all, the largest 0.594 acres. Land use: Urban 87. Zoning: INT Interim (86), Road (1).
32 in a FEMA high-risk flood zone; 87 in the Special Management Area; 70 in a tsunami evacuation zone; 3 with a cesspool.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (2) 3-2-015:001 | 0.547 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:002 | 0.594 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:003 | 0.274 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:004 | 0.264 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:005 | 0.380 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:006 | 0.193 | Urban | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 3-2-015:007 | 0.199 | Urban | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 3-2-015:008 | 0.251 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:009 | 0.290 | Urban | INT Interim | AE | SMA, flood AE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:010 | 0.350 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:011 | 0.094 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 3-2-015:012 | 0.265 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:013 | 0.202 | Urban | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 3-2-015:014 | 0.087 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:016 | 0.068 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:017 | 0.105 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:018 | 0.086 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:020 | 0.086 | Urban | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 3-2-015:022 | 0.255 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:023 | 0.283 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:024 | 0.332 | Urban | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 3-2-015:025 | 0.328 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:026 | 0.339 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:027 | 0.346 | Urban | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 3-2-015:028 | 0.323 | Urban | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 3-2-015:029 | 0.330 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:030 | 0.202 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:031 | 0.180 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:032 | 0.169 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:033 | 0.166 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:034 | 0.159 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:035 | 0.161 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:036 | 0.171 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:037 | 0.191 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:038 | 0.223 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:039 | 0.312 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:040 | 0.573 | Urban | INT Interim | X | SMA, tsunami |
| (2) 3-2-015:041 | 0.332 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:042 | 0.345 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:043 | 0.306 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:044 | 0.195 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:045 | 0.205 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:046 | 0.200 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:047 | 0.212 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:048 | 0.198 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:049 | 0.193 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:050 | 0.202 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:051 | 0.212 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:052 | 0.167 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:053 | 0.166 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:054 | 0.161 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:055 | 0.164 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:056 | 0.160 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:057 | 0.160 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:058 | 0.138 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:059 | 0.138 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:060 | 0.140 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:061 | 0.140 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:062 | 0.139 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:063 | 0.160 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:064 | 0.162 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:065 | 0.159 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:066 | 0.154 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:067 | 0.165 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:068 | 0.166 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:069 | 0.164 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:070 | 0.183 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:071 | 0.173 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:072 | 0.209 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:073 | 0.165 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:074 | 0.164 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:075 | 0.219 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:076 | 0.148 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:077 | 0.138 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:078 | 0.141 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:079 | 0.139 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:080 | 0.138 | Urban | INT Interim | X | SMA |
| (2) 3-2-015:081 | 0.160 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:082 | 0.141 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:083 | 0.141 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:084 | 0.141 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:085 | 0.168 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:086 | 0.138 | Urban | INT Interim | X | SMA, tsunami (extreme) |
| (2) 3-2-015:087 | 0.297 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:088 | 0.083 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:089 | 0.100 | Urban | INT Interim | AE | SMA, flood AE, tsunami |
| (2) 3-2-015:666 | 0.073 | Urban | Road | AE | SMA, flood AE, tsunami |
One parcel of plat 2-3-2-015?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file