Plat (2) 1-4-008 — Haneoʻo / Hāmoa
41 parcels in plat 2-1-4-008, Haneoʻo / Hāmoa (Maui), 50.2 acres in all, the largest 11.11 acres. Land use: Rural 40, — 1. Zoning: INT Interim (40).
28 in a FEMA high-risk flood zone; 40 in the Special Management Area; 40 in a tsunami evacuation zone; 23 with a cesspool.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (2) 1-4-008:001 | 1.48 | Rural | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
| (2) 1-4-008:002 | 11.11 | — | INT Interim | — | |
| (2) 1-4-008:003 | 1.41 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:004 | 4.54 | Rural | INT Interim | VE | SMA, flood VE, tsunami, SLR 3.2 ft, 1 cesspool |
| (2) 1-4-008:005 | 0.718 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:006 | 1.07 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:007 | 0.859 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:008 | 0.601 | Rural | INT Interim | X | SMA, tsunami (extreme), 1 cesspool |
| (2) 1-4-008:009 | 0.715 | Rural | INT Interim | X | SMA, tsunami |
| (2) 1-4-008:010 | 3.08 | Rural | INT Interim | X | SMA, tsunami |
| (2) 1-4-008:011 | 1.19 | Rural | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 1-4-008:012 | 0.432 | Rural | INT Interim | X | SMA, tsunami |
| (2) 1-4-008:013 | 1.00 | Rural | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 1-4-008:014 | 0.501 | Rural | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 1-4-008:015 | 0.205 | Rural | INT Interim | X | SMA, tsunami |
| (2) 1-4-008:016 | 1.21 | Rural | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 1-4-008:017 | 0.656 | Rural | INT Interim | AE | SMA, flood AE, tsunami, 2 cesspools |
| (2) 1-4-008:018 | 0.666 | Rural | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 1-4-008:019 | 0.672 | Rural | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 1-4-008:020 | 2.20 | Rural | INT Interim | AE | SMA, flood AE, tsunami, 1 cesspool |
| (2) 1-4-008:021 | 0.509 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:022 | 1.28 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 2 cesspools |
| (2) 1-4-008:023 | 0.218 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:024 | 0.627 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:025 | 0.644 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:027 | 0.507 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:028 | 0.057 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:029 | 0.413 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:030 | 0.367 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:031 | 0.324 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:032 | 0.252 | Rural | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 1-4-008:033 | 0.391 | Rural | INT Interim | X | SMA, tsunami |
| (2) 1-4-008:034 | 0.224 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:035 | 1.40 | Rural | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 1-4-008:036 | 0.865 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:037 | 0.501 | Rural | INT Interim | VE | SMA, flood VE, tsunami, 1 cesspool |
| (2) 1-4-008:038 | 0.046 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:040 | 1.60 | Rural | INT Interim | X | SMA, tsunami |
| (2) 1-4-008:041 | 0.513 | Rural | INT Interim | X | SMA, tsunami, 1 cesspool |
| (2) 1-4-008:042 | 1.85 | Rural | INT Interim | VE | SMA, flood VE, tsunami |
| (2) 1-4-008:777 | 3.29 | Rural | — | VE | SMA, flood VE, tsunami, SLR 3.2 ft |
One parcel of plat 2-1-4-008?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file