Plat (1) 8-7-015 — Waiʻanae
18 parcels in plat 1-8-7-015, Waiʻanae (Oʻahu), 23.2 acres in all, the largest 9.28 acres. Land use: Urban 18. Zoning: P-2 (17).
8 in a FEMA high-risk flood zone; 18 in the Special Management Area; 18 in a tsunami evacuation zone.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (1) 8-7-015:001 | 0.853 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:003 | 0.907 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:004 | 0.929 | Urban | P-2 | X | SMA, tsunami, fire high |
| (1) 8-7-015:005 | 0.984 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:006 | 0.944 | Urban | — | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:007 | 0.917 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:008 | 0.862 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:009 | 0.822 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:010 | 0.746 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:011 | 0.678 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:012 | 0.621 | Urban | P-2 | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:013 | 0.056 | Urban | P-2 | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:022 | 9.28 | Urban | P-2 | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:033 | 1.18 | Urban | P-2 | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:035 | 1.24 | Urban | P-2 | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:037 | 0.655 | Urban | P-2 | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:038 | 0.671 | Urban | P-2 | AE | SMA, flood AE, tsunami, SLR 3.2 ft, fire high |
| (1) 8-7-015:039 | 0.865 | Urban | P-2 | X | SMA, tsunami, SLR 3.2 ft, fire high |
One parcel of plat 1-8-7-015?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file