Plat (1) 4-1-014 — Waimānalo / Maunalua
12 parcels in plat 1-4-1-014, Waimānalo / Maunalua (Oʻahu), 442.2 acres in all, the largest 106 acres. Land use: Conservation 10, — 2. Zoning: P-1 (11).
2 in a FEMA high-risk flood zone; 7 in the Special Management Area; 7 in a tsunami evacuation zone; 9 with a cesspool.
| TMK | Acres | Land use | Zoning | Flood | Restrictions |
|---|---|---|---|---|---|
| (1) 4-1-014:002 | 21.39 | Conservation | P-1 | X | SMA, tsunami, 1 cesspool, DHHL |
| (1) 4-1-014:004 | 106 | Conservation | P-1 | X | 1 cesspool |
| (1) 4-1-014:005 | 20.63 | Conservation | P-1 | AE | SMA, flood AE, tsunami, DHHL |
| (1) 4-1-014:006 | 8.33 | Conservation | P-1 | X | SMA, tsunami, 1 cesspool, DHHL |
| (1) 4-1-014:007 | 91.46 | Conservation | P-1 | X | 1 cesspool, DHHL |
| (1) 4-1-014:008 | 100 | Conservation | P-1 | X | 1 cesspool, DHHL |
| (1) 4-1-014:009 | 77.36 | Conservation | P-1 | — | SMA, tsunami, 1 cesspool |
| (1) 4-1-014:010 | 0.166 | — | — | — | SMA, tsunami, SLR 3.2 ft, 1 cesspool |
| (1) 4-1-014:011 | 2.08 | Conservation | P-1 | AE | SMA, flood AE, tsunami |
| (1) 4-1-014:013 | 12.09 | Conservation | P-1 | X | |
| (1) 4-1-014:014 | 1.82 | — | P-1 | X | SMA, tsunami, SLR 3.2 ft, 1 cesspool |
| (1) 4-1-014:016 | 0.374 | Conservation | P-1 | X | 1 cesspool, DHHL |
One parcel of plat 1-4-1-014?
The report gives the exact share of the lot in each zone, the zoning rules and the cesspool status, dated and in one PDF.
$19PDF within 24 h · you pay after receiving it · $49 with the cesspool and sea-level-rise file